Demo Project
Progress
0 / 7 steps
Step 1 of 7
PDF pp. 2–3Lay out all panels on a clean, carpeted floor to avoid scratches.
Open the hardware bag and sort screws, cam locks, dowels, and brackets into separate groups.
Check the parts list on page 1 of the manual and confirm all items are present.
Keep the cardboard packaging nearby — it makes a good work surface.
Check: You should have 2 side panels, 1 top, 1 bottom, 4 drawer fronts, and a full hardware bag.